Status report: Streamlining WDG interconnection — Clean Coalition

The missing piece: Wholesale distributed generation (WDG)

The WDG interconnection problem

Streamlining WDG interconnection

Progress on WDG interconnection

Guidelines and recommendations

WDG interconnection pilot

Best practices report

The work ahead

--

--

--

Clean energy analyst, advocate, communicator spreading the good solar word

Love podcasts or audiobooks? Learn on the go with our new app.

Recommended from Medium

Climate Change + Drought = More People and Water-Intensive Factories in the Southwest???

Lake Powell low water level

Tree’s 🌲

Below the Surface: Data and Groundwater

EU Backs Down From Censoring Vegan Foods

“The Clock Is Ticking”: Inside the Worst U.S. Maritime Disaster in Decades

No, rebranding old ideas isn’t helping a dying climate delay industry

TRAGEDY OF COMMONS:

Smartphones are paving way for the Antichrist, says the head of the Russian church

Get the Medium app

A button that says 'Download on the App Store', and if clicked it will lead you to the iOS App store
A button that says 'Get it on, Google Play', and if clicked it will lead you to the Google Play store
Rosana Francescato

Rosana Francescato

Clean energy analyst, advocate, communicator spreading the good solar word

More from Medium

Finding a file descriptor leak

How to install mongodb to Docker

Local setup for testing on zkSync 2.0

Async and Defer Explained